Monday, January 7, 2008

Riley Approved



After 2 days of demo including the removal of 1 4x5 closet, 340 sq/ft of tile, 280 sq/ft of carpet, I am tired. The hardest part of the demo was hammer drilling the mortar to separate it from the concrete sub floor. The third day included rubbish removal, framing of the closet with 3 5/8 steel studs and beginning the layout of the floor. As you can see the bamboo floor is Riley approved.